UH-1 Main Beam Reinforcement Solution
Originally posted 13 June 14
In response to UH-1 Main Beam issue:
Vector has a solution that reinforces the area of the main beam, below the floor from STA 123 to 143, to prevent cracking. This structural installation has been FAA DER approved – we have installation instructions and parts kit available as well. Please let us know if we can be of assistance to you during your Huey inspections.
StandardAero North America
HSNA – Langley
#101B – 5947 206A Street, Langley
British Columbia, Canada V3A 8M1
Tel: 604.514.0388 | Fax: 604.514.0389
HSNA – Alabama
22378 Billie Blackmon Road, Andalusia
Alabama, USA 36421
Tel: 334.222.1277 | Fax: 334.222.1954
Toll Free 1.888.729.2276
www.vectoraerospace.com