

UH-1 Tailboom Motion Detection System
On September 16, 2013, about 1535 Pacific daylight time, a Garlick UH-1B, N204UH, experienced a tailboom separation while logging in...


LH Tailboom Fitting cracked
Originally published 6/05/2024 We are the owners of the tail boom referenced in this feed attached are a few more pictures of our...


Upper LH Tailboom Longeron
Originally published 6/5/2014 on Uh1OPS Maintenance blog We are currently working on an AOG in Colorado to repair this area. We have a...


TAIL BOOM FITTING CRACK- Cal Fire
Originally Posted June 2014 These are photos showing a crack we found on a LH upper tailboom attach fitting. The crack was initiated at...


Tail boom Crack
Originally posted 06/05/2014 I am enclosing photos of a upper tail boom attachment fitting and airframe deck & tail boom support beam....


Main Rotor Retaining Nut Lock
Original Post 8/27/2018 I was contacted by a mechanic who in the process of removing a main rotor hub assembly after removing the main...


UH-1 Transmission Oil Lines
Reprint of original 4-15-2014 Blog Post In regards to the UH-1-05- ASAM-01 military message on transmission oil lines. I have personally...


UH-1-05-ASAM-01 Transmission Oil Line System QD
Originally posted 4-15-14 on UH1OPS Blog UNCLASSIFIED . MSG DTG 202310Z JAN 05 . FROM CDRAMCOM, REDSTONE ARSENAL, AL //AMSAM-SF-A// ....
FAA AD 2022-20-14: Main Rotor Gearbox
The FAA is adopting a new airworthiness directive (AD) for Bell Textron Inc., Model 204B, 205A, 205A-1, 205B, 210, 212, 412, 412CF, and...
ASB UH-1H-22-23 TAILBOOM ATTACHMENT HARDWARE
ASB UH-1H-22-23 Page 1 of 7 Approved for public release. ALERT SERVICE BULLETINUH-1H-22-23 20 July 2022 MODEL AFFECTED:UH-1H SUBJECT:...




































